ecoi

Watling Academy

Watling Academy

A new super school purpose built 12 form entry secondary school to provide 1800 places for the Western Expansion in Milton Keynes.

Technology

Industry Standards

Project Details

Eco-i provided a BEMS to control & monitor the buildings HVAC systems including MVHR units, Natural Ventilation and LPHW / MCW / DHW central plant. Eco-I also provided a metering system to monitor all meters across the site. The metering system provides the usage information to the building manager. The building is provided with various form 1 ELV BEMS panel within the plantrooms and roof. The power to the plant is provided by a dedicated distribution board designed and provided by eco-i.

Eco-i Works

Watling Academy1
Watling Academy

Facility Management Benefits

The BEMS server head end software provides full integration to all connected systems and offers the building operator full reporting of the operating status of all systems. The BEMS is tailored to provide two-way graphics navigation along with features such as weekly reports and alarm management via email. The EMS is provided with dashboard displays for the building operator to view and manage their energy usage.