First Street

First Street Manchester

Construction of the zero carbon factory.
A major factor of this project was to help innocent achieve their carbon neutral requirements with the new production facility. Once fully operational the factory will produce 300m litres of juices and smoothies each year.

Technology

Industry Standards

Project Details

eco-i were appointed to design, supply and commission a HVAC control system for 12no air handling units and 85No fan coil units which were to be connected to a site wide smart integrated control system which links all the factories HVAC, power, refrigeration, productions and despatch into one platform. Construction of the zero carbon factory started during Brexit and construction continued during the pandemic. eco-i worked closely with the clients team to ensure the high specification was met throughout the project and to overcome all the challenges that were faced during brexit and covid. eco-i carried out pre despatch commissioning of the control panels including full client acceptance test.

Eco-i Works

First Street Manchester1
First Street Manchester2

Facility Management Benefits

Each control panel has local point access using local dongles in the controllers. This provides the maintenance team local point access whilst at each AHU. Each controller is provided with embedded graphics which allow simple adjustments to temperature and fan speeds. The web graphics were developed to allow the site team to change the functions of the AHUs via graphic pages.