ecoi

Dow Chemicals

Dow Chemicals Cheshire

26,000 sq ft fit out to provide new offices, machine hall and laboratories.

Technology

Industry Standards

Project Details

eco-i were appointed to design, supply, installation and commission a HVAC control system. The project consisted of various critical areas of laboratory spaces with a complex pressure routine due to the layout of the building spaces. Various VAV boxes and central plant were provided to achieve the conditions within the spaces. The BMS controlled the spray booth dampers and ventilation systems. Local indication panels were provided for the staff to have visibility of the condition of the lab spaces. Central LPHW gas boilers where provided which served the AHU’s and various reheat batteries in the spaces.

Eco-i Works

Dow Chemicals Cheshire1

Facility Management Benefits

The BEMS head end software provides full integration to all connected systems and offers the building operator full reporting of the operating status of all connected systems across the site. The BEMS is tailored to provide two-way graphics navigation along with features such as weekly reports and alarm management via email. The EMS is provided with dashboard displays for the building operator to view and manage their energy usage.