ecoi

Lewisham Gateway

Lewisham Gateway London

Construction of three residential blocks. The project consisted of 322 BTR units within block 1&2 and 43 affordable homes within block.

Technology

Industry Standards

Project Details

eco-i were appointed to design, supply, install and commission a control system to provide landlord systems control and monitoring of the Ventilation, AC, MCW, DHW and landlord meters. The buildings are provided with ASHP generated DHW to serve the apartments. The landlord meters are monitored on the BMS and dashboards provided for interrogation. The communal areas ventilation and AC systems are monitored at the BMS.

Eco-i Works

Lewisham Gateway London2
Lewisham Gateway London1

Facility Management Benefits

The control panels are provided with local touchscreens to provide day to day management and alarm monitoring. The system provides a single point for the landlord to monitor their systems within the blocks.