ecoi

THG Icon Park Cheshire

THG Icon Park Cheshire

Comprises 5No buildings to form ICON campus for THG. The development includes new office building, new studios building and 3No warehouses.

Technology

Industry Standards

Project Details

Eco-I was appointed to design and deliver the BEMS and EMS package. The project comprises several buildings using VAV, VRF, LPHW Heating, Central DHW and local extract systems. A BMS & EMS was installed in each building and all connects to THG central BEMS head end PC. Eco-I worked closely with the client to carry out consultancy and design works to ensure their new BEMS was tailored to suit their FM requirements.

Eco-i Works

Facility Management Benefits

The BEMS server head end software provides full integration to all connected systems and offers the building operator full reporting of the operating status of all systems. The BEMS is tailored to provide two-way graphics navigation along with features such as weekly reports and alarm management via email. The EMS is provided with dashboard displays for the building operator to view and manage their energy usage.
Case_Study_PowerPoint-48