Hinckley Park Leicestershire

Unit 2 provides a new 532,500 sq ft high bay distribution warehouse with ancillary offices, service yards, car parking, drainage and internal and external  services.

Eco-I provided the BEMS & metering system. The building services included Boosted Cold Water, VRF System Integration, Central air handling unit (AHU) and a Central Toilet fan.

The building utilises a VRF system across the floor plates. The BMS controls and maintains temperatures & fresh air throughout the office building.

The control panel was constructed to form 2 to provide power and controls to the plant.

A network display panel is provided on the control panel fascia to allow full interface to the HVAC services and VRF system.