The new medical centre in Warrington features eight multi-purpose treatment rooms, a spacious waiting room, improved car parking and an onsite pharmacy with a private consultation room.

Eco-I provided the BEMS & metering system. The building services included LPHW heating plant, Domestic Hot Water, Underfloor Heating and a Central air handling unit (AHU). The BEMS Controls the various heating circuits and underfloor heating Zones to maintain the temperatures within the building.

Power to the plant has been derived from dedicated mechanical electrical board which was designed and installed by eco-i.